KDS.LC-02 Command & Staff Container provides a facility and required office work conditions for military staff of various levels of command and control in the field.
KDS.LC-02 Container is constructed on the basis of a standard 20-foot ISO container. The container is structurally divided into two compartments inside: Technical Compartment and Staff Compartment. Staff Compartment in the form of collapsible construction of folded walls and ceilings, is capable to extend its office space up to 3 times, creating a large area suitable for installation of various types of special equipment as required. The Technical Compartment basic equipment is as follows: air conditioning system (cooling and heating), dust protection filtering and ventilation, power supply facility. What is more the Technical Compartment is capable to be provided with IT equipment as well as other special devices as required by the user. The body of the container is equipped with the latest technology hydraulic servomotor supports which enable easy and simple self-loading and unloading of the container from any transportation chassis. The Container provides Staff with a suitable comfort of work environment and regardless of weather conditions outside its equipment governs not only a required air temperature and humidity but keeps high quality, dust and contamination free air conditions of the interior as well.
Containers developed on base of the primary KDS.LC-02 Container constitute a line of special containers to be utilized as Staff Containers of Command, Control and Communication posts in the field.
Operating parameters
Total weight of container | 8 500 kg |
Maximum total weight of the container with equipment | 12 000 kg |
External dimensions of the container (L x W x H) | 4.522 x 2.438 x 2.438 m |
External dimensions of the container when extended (L x W x H) | 4.522 x 6.060 x 2.438 m |
Basic cargo space (for transportation of the equipment ) | 10.1 m2 |
Total floor space of the container (when extended) | 25.3 m2 |
Unloading time of the container from the vehicle chassis | 10 minutes |
Extension time of container to make it ready for work | up to 45 minutes (depending on conditions) |
Operating temperature range | from -30 up to +55°C |